Frederic Gurr
2018-10-18 14:08:14 UTC
Hi,
Since there were no running builds and no requests for extensions, I
declare the staging for SimRel 2018-12 M1 complete.
Aggregation builds will be disabled until Friday at the usual release
time of 10am EDT.
Thanks for all contributions so far and a gentle reminder to test early
and often. :)
Regards,
Fred
Since there were no running builds and no requests for extensions, I
declare the staging for SimRel 2018-12 M1 complete.
Aggregation builds will be disabled until Friday at the usual release
time of 10am EDT.
Thanks for all contributions so far and a gentle reminder to test early
and often. :)
Regards,
Fred
--
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH
Annastr. 44, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH
Annastr. 44, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque