Frederic Gurr
2018-08-30 21:00:48 UTC
Hi,
With a bit of delay, the staging repository for 2018-09 M3 is complete
and ready for EPP and others to do their part.
To confirm that everything works as expected, please test
=> http://download.eclipse.org/staging/2018-09/
This will become the official "M3 Simultaneous Milestone" on Friday.
=> http://download.eclipse.org/releases/2018-09/
Thanks for all contributions. Please remember to test early and often!
Regards,
Fred
With a bit of delay, the staging repository for 2018-09 M3 is complete
and ready for EPP and others to do their part.
To confirm that everything works as expected, please test
=> http://download.eclipse.org/staging/2018-09/
This will become the official "M3 Simultaneous Milestone" on Friday.
=> http://download.eclipse.org/releases/2018-09/
Thanks for all contributions. Please remember to test early and often!
Regards,
Fred
--
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH
Annastr. 44, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque
Frederic Gurr
Release Engineer | Eclipse Foundation Europe GmbH
Annastr. 44, D-64673 Zwingenberg
Handelsregister: Darmstadt HRB 92821
Managing Directors: Ralph Mueller, Mike Milinkovich, Chris Laroque